top of page

Transform Your Kitchen With the nuDoors DIY Process

Save thousands, skip the remodel, and refresh your cabinets in just a weekend.

DIY Made Simple

Measure. Order. Install.

  1. Measure your doors & drawers

  2. Place your order online in minutes

  3. Refinish your boxes with a fresh coat of paint

  4. Install your nuDoors

DIY Steps

Untitled design (4).png

Step 1

Begin by measuring your existing cabinet sections.

All you need is a simple tape measure, no special tools required.

 

Enter your numbers into our nuEstimate tool to get instant pricing, so you’ll know right away what your project will cost.

 

No waiting, no contractor delays.

Step 2

Next, customize your look. Choose from a wide selection of door styles, finishes, and hardware to match your vision.

 

Our system calculates everything for you, including hinges and drilling, so your order is accurate and ready to go.

 

Once submitted, your doors are produced in about 7–10 business days and shipped directly to your door.

Untitled design (3).png
Untitled design (5).png

Step 3

While you’re waiting for your nuDoors to arrive, it’s the perfect time to prep your cabinet boxes.​

​

We’ll supply you with matching paint in your chosen color, so you can give your cabinet boxes a fresh coat of primer and paint for a factory-new look.

​

This step ensures that when your nuDoors are installed, everything blends seamlessly for a kitchen that feels brand new.

Step 4

When your order arrives, it’s time for the fun part.

 

Install your nuDoors using the included soft-close hinges and hardware.

 

With just a drill and screwdriver, you can complete most kitchens in a single day.

 

No remodel stress, no heavy construction.

after (8).png

Why Choose the DIY Path?

  • Save 50–70% compared to remodeling

  • Finish in days, not weeks

  • Backed by our 5-year Dura-Finish™ warranty

  • Easy-to-follow videos, guides, and support

DIY Spotlight

salvagedbysamme.jpg

411K Followers

myhouseof8.jpg

115K Followers

full steam designs.jpg

359K Followers

FAQ

Do I need special tools?

No, that’s the beauty of the DIY path with nuDoors. You don’t need a full workshop or expensive equipment. Most homeowners complete their project with just a few basics: Tape measure (for taking accurate door and drawer measurements) Screwdriver or drill (for removing old doors and attaching new ones) Paint supplies (brush, roller, or sprayer) for refinishing your cabinet boxes That’s it. With these common household tools and our step-by-step guides, you’ll be ready to measure, refinish your cabinet boxes, and install your nuDoors, no specialty tools or pro experience required.

How long does the DIY process take?

From the time you place your order, production typically takes 7–10 business days. Once your doors arrive, most homeowners complete the project in about 3 days, usually 2 days to refinish the cabinet boxes and 1 day to install the new nuDoors. ​ In less than two weeks from start to finish, you can go from outdated cabinets to a kitchen that feels brand new.

Are DIY projects covered by warranty?

Yes, all nuDoors purchased pre-finished are backed by our 5-year warranty. That means your doors are covered for durability, finish quality, and performance, giving you peace of mind long after installation. ​ For more information, please visit our Terms and Conditions.

How do nuDoors compare to a full remodel?

A full kitchen remodel can take weeks and cost $20,000–$30,000 or more. With nuDoors, you keep your existing cabinet boxes and simply replace the doors and drawers. The result is a kitchen that looks brand new, at a fraction of the cost and with far less disruption. Most projects are completed in just a few days, not weeks, and every order is backed by our 5-year warranty.

Ready to Get Started?

bottom of page